DATABASE OF ALL PROJECTS (ONGOING & COMPLETED): 2009-2011

AN UPDATE OF PROJECTS EXECUTED IN

LOCAL GOVERNMENT AREAS

OF ABIA STATE



FROM

2009 – 2011


1)        ISUIKWUATO LOCAL GOVERNMENT AREA

HEALTH CENTRES

SNO    LOCATION          STATUS                   % COMPLETED
1.        OTANKPA             COMPLETED               100

                                         & PAINTED             
 2.        NUNYA                COMPLETED            
                                         & PAINTED                  100
3.        AMABA                COMPLETED            
                                         & PAINTED                  100
4.        UMUEBERE AJA  COMPLETED            
                                         & PAINTED                  100
5.        AMUNE OVIM      COMPLETED
                                         & PAINTED                  100
6.        AMAIYI 
          OBILOHIA              LINTEL LEVEL             60
7.       AMIYI UHU            COMPLETED 
                                         & PAINTED                  100
8.        NDUNDU              APPROACHING 
                                         LINTEL LEVEL              40
9.        AMACHARA         FINISHING                    90
10.      UMUMARA 
           UTURU                 LINTEL LEVEL              60      
11.      NVURUNVU          COMPLETED 
                                         & PAINTED                  100


SCHOOLS CONSTRUCTED AND RENOVATED
1.        AKPUKPARA UTURU COMMUNITY SCHOOL   - COMPLETED
2.        AMIBO CENTRAL SCHOOL, OGUDUASA          - COMPLETED

WATER PROJECTS
1.        ONGOING REHABILITATION OF UTURU WATER SCHEME

ROAD REHABILITATION
1.         EHABILITATION/ PATCHING OF AKARA JUNCTION-OVIM-AMAOKWE-
OGUDIASAA ROAD. ONGOING

TRANSFORMER DISTRIBUTION
1.        NDUDU ISIUKWUATO AUTONOMOUS COMMUNITY
2.        IMENYI COMMUNITY
3.        AMAIGBO OGUDUASAA
4.        300KVA.33/0.415KV        -           OWERRE ISUNABO UTURU
           COMMUNITY
5.        300KVA.33/0.415KV        -           OBINA ETITI UTURU COMMUNITY


2)        UMUNNEOCHI LOCAL GOVERNMENT AREA

HEALTH CENTRES

SNO    LOCATION                      STATUS                % COMPLETED
1.        OBOLO EZIAMA             COMPLETED        100
2.        UMUCHA-AMUDA          COMPLETED        100
3.        ACHARA                         COMPLETED         100
4.        AMORIE                          COMPLETED         100
5.        LOKPANTA                        FINISHING            80
6.        URU-UMUCHIEZE             FINISHING            80
7.        AROIKPA                           FINISHING            80
8.        UHUOLUGHO
           –AGULATO                     COMPLETED          100

SCHOOLS CONSTRUCTED AND RENOVATED
1.        OBINOLU TECHNICAL SCHOOL, NGODO ISUOCHI   - COMPLETED
2.        CENTRAL SCHOOL, LEKWESHI, UMUCHIEZE LOKPAUKWU            
            - COMPLETED

TRANSFORMER DISTRIBUTION
1.        ARO IKPE AUTONMOUS COMMUNITY


3)        OSISIOMA LOCAL GOVERNMENT AREA

HEALTH CENTRES

SNO    LOCATION                          STATUS                                 % COMPLETED
1.        ISIALA-OSOKWA                COMPLETED & PAINTED              100
2.        AKANU-UKWU                    COMPLETED & PAINTED              100
3.        OKPUALA UMUGWOR       LINTEL LEVEL                                 60
4.        UMUOYORO-AMATOR      COMPLETED                                   100
5.        OWOALA                              COMPLETED & PAINTED             100
6.        MBUTU UMUOJIMA            LINTEL LEVEL                                 60
7.        UMUEZE                               LINTEL LEVEL                                 40
8.        ETITI AMAVO                      COMPLETED & PAINTED              100
9.        OBERETE-ASA                     COMPLETED & PAINTED              100
10.      AMANKWU-OSOKWA      COMPLETED & PAINTED                 100

ROAD CONSTRUCTION AND REHABILITATION
1.        CONSTRUCTION OF UNITY GARDEN, OSISIOMA RING ROAD, ABA
- ONGOING

SCHOOLS CONSTRUCTED AND RENOVATED
1.        AMAVO-UKWU PRIMARY SCHOOL      - 70% COMPLETED
2.        OKPUALA UMUOGWO COMMUNITY PRIMARY SCHOOL 
                                                                            - 70% COMPLETED
3.        AMAPU UMUAVO PRIMARY SCHOOL - 10% COMPLETED

TRANSFORMER DISTRIBUTION
1.        300KVA.11/0.415KVA     UMUNMAAISE
2.        300KVA.11/0.415KVA     ETITI AMAVO
3.        300KVA.11/0.415KVA     UGWU NAMBANYA
4.        300KVA.11/0.415KVA     ABAYI ANCIENT KINGDOM
5.        300KVA.11/0.415KVA     EGBOLU OSUSU UMUOSISI
6.        300KVA.33/0.415KVA     EGBELU ETITI AUTONOMOUS COMMUNITY
7.        300KVA.33/0.415KVA     AMUZU, AMASAA
8.        300KVA.33/0.415KVA     ARONGWA
9.        300KVA.33/0.415KVA     AGALABA COMMUNITY
10.      300KVA.33/0.415KVA     OKPU UMUOBO


4)        UGWUNAGBO LOCAL GOVERNMENT AREA

HEALTH CENTRES

SNO    LOCATION                  STATUS                                 % COMPLETED
1.        AZAA                         COMPLETED                                      100
2.        ASA UMUNKA          COMPLETED                                       100
3.        UMUEHUKWU          COMPLETED                                       100
4.        UMUGARA                COMPLETED                                       100
5.        OZAA 
           UMUEBUKWU          COMPLETED                                       100
6.        NGWAIYIEKWE        COMPLETED                                       100
7.        ISIMANU                   COMPLETED                                       100
8.        UMUAJA                    COMPLETED                                       100
9.        UMUODO                  COMPLETED                                       100

ROAD CONSTRUCTION AND REHABILITATION
1.        CONSTRUCTION OF UMUGO-ASAUMUNKA-UMUODO - ONGOING

SCHOOLS CONSTRUCTED AND RENOVATED
1.        AKANU NGWA SCHOOL                                       -           65%
2.        OBEGU SECONDARY SCHOOL                            -           65%
3.        COMPREHENSIVE SECONDARY SCHOOL          -           65%

TRANSFORMER DISTRIBUTION
1.        300KVA.33/0.415KVA     UMUOBASI AMAVO
2.        300KVA.33/0.415KVA     IHEYI
3.        300KVA OBASIUKWU AUTONOMOUS COMMUNITY


5)        ISIALA NGWA SOUTH LOCAL GOVERNMENT 
           AREA

SCHOOLS CONSTRUCTED AND RENOVATED
1.        UMUOJIMA COMMUNITY PRIMARY SCHOOL       - 70%
2.        UMUACHA PRIMARY SCHOOL                                - 70%

TRANSFORMER DISTRIBUTION
1.        300KVA.33/0.415KVA     AMAIYI NVOSI
2.        300KVA.33/0.415KVA     ONICHA NGWA AUTONOMOUS COMMUNITY
3.        300KVA.33/0.415KVA     UMUKWANUKWU NGBOKO AMIRI ANCIENT
                                        KINGDOM


6)        UKWA EAST LOCAL GOVERNMENT AREA

HEALTH CENTRES

SNO    LOCATION                         STATUS                                 % COMPLETED
1.        UMUTURU                         ONGOING                                        80
2.        UMUEKECHI                    COMPLETED                                     100
3.        UMUKU-OZAA                 COMPLETED                                     100
4.        NDIDA OZAA
           UMUEBULU NGWU          FINISHING                                       80
5.        OBIGA                               COMPLETED                                    100
6.        UMUITOR                           FINISHING                                      80
7.        UMUAKA                           COMPLETED                                   100
8.        OWO-ASA                          FINSIHING                                      100
9.        EZENDIOMA                      LINTEL LEVEL                                  60

SCHOOLS CONSTRUCTION AND RENOVATION
1.        OWAZA SECONDARY SCHOOL I                  - 85%
2.        OWAZA SECONDARY SCHOOL II                - 40%
3.        OWAZA SECONDARY SCHOOL III               - 50%
4.        OBUZOR-UMUELECHI COMMUNITY 
           PRIMARY SCHOOL                                       - 30%
5.        OBIBOR COMMUNITY PRIMARY 
           SCHOOL                                                         - 70%
6.        OKOHIA COMMUNITY PRIMARY 
           SCHOOL                                                         - COMPLETED
7.        UMUEKECHI HIGH SECONDARY 
           SCHOOL                                                         - 80%
8.        MBANO CENTRAL SCHOOL                         - 80%
9.        OGWE OMPREHENSIVE SECONDARY 
           SCHOOL                                                          - 30%
10.      OBOKWE SECONDARY SCHOOL                  - 20%
11.      COMMUNITY PRIMARY SCHOOL                 - 20%
12.      OBOKWE COMMUNITY PRIMARY 
           SCHOOL                                                          - 20%
13.      UMUDOBIA PRIMARY SCHOOL                    - 60%
14.      IMO RIVER COMMUNITY PRIMARY 
           SCHOOL                                                          - 60%
15.      OZAR SECONDARY SCHOOL I                     - 50%
16.      OZAR SECONDARY SCHOOL II                    - 50%
17.      OZAR CENTRAL SCHOOL                             - 50%
18.      OWOR ASA PRIMARY SCHOOL                    - 50%
19.      UMUORIE PRIMARY SCHOOL                       - COMPLETED
20.      UMUKALU PRIMARY SCHOOL                      - 60%
21.      UMUNTEKE COMMUNITY PRIMARY 
           SCHOOL                                                           - COMPLETED
22.      CONSTRUCTION OF 6 CLASSROOM 
           BLOCKS, 2NOS @ COMMUNITY PRIMARY 
           SCHOOL, EZENDIOMA                                   - COMPLETED

ROAD CONSTRUCTION AND REHABILITATION
1.        MAINTENANCE OF OBEHIE JUNCTION AREA -COMPLETED

BOREHOLE PROJECTS
1.    DRILLING OF A 6” MOTORIZED SOLAR WATER BOREHOLE WITH  CONSTRUCTION OF 40,000 LITRES PRESSED STEEL TANK AND 1.5KM RETICULATION AT IGIRIUKWU ASA            - 80% COMPLETED.

2.   DRILLING OF A 6” MOTORIZED SOLAR WATER BOREHOLE WITH CONSTRUCTION OF 40,000 LITRES PRESSED STEEL TANK AND 1.5KM RETICULATION AT ISI ETITIOHIA ASA        - 80% COMPLETED.

3.   DRILLING OF A 6” MOTORIZED SOLAR WATER BOREHOLE WITH CONSTRUCTION OF 40,000 LITRES PRESSED STEEL TANK AND 1.5KM RETICULATION AT IPU WEST, ASA  - 80% COMPLETED.

4.   DRILLING OF A 6” MOTORIZED SOLAR WATER BOREHOLE WITH CONSTRUCTION OF 40,000 LITRES PRESSED STEEL TANK AND 1.5KM RETICULATION AT ISI ETITIOHIA IPU ASA - 80% COMPLETED.

5.    DRILLING OF A 6” MOTORIZED SOLAR WATER BOREHOLE WITH CONSTRUCTION OF 15,000 GP TANK ON A 6 METRES HEIGHT STANCHION AT UMUNGEDE ARMY BASE, ASA ROAD, UMUAHIA    - 80% COMPLETED.


TRANSFORMER DISTRIBUTION
1.        300KVA.11/0.415KVA     OBEAKU COMMUNITY
2.        300KVA.33/0.415KVA     UZOAKU COMMUNITY DEVELOPMENT
3.        300KVA.33/0.415KVA     UNION UKWA


7)        UKWA EAST LOCAL GOVERNMENT AREA

HEALTH CENTRES

SNO    LOCATION                         STATUS                                 % COMPLETED
1.        OSUSU AMAIRI              COMPLETED                                     100
2.        ISIALA AMAPU               COMPLETED                                     100
3.        UMUEKPE NTIGHA        COMPLETED                                     100
4.        AMAEKPU ISIAHIA        COMPLETED                                     100
5.        ICHI UKWU                     FINISHING                                       
6.        UMUOGBOKA EZIAMA
  NTIGHA                          COMPLETED                                     100
7.        AMANO NSULU              COMPLETED                                     100
8.        MBUTU UKWU               COMPLETED                                     100
9.        NGWA AMA                    COMPLETED                                     100
10.      UMUNKPEYI NVOSI       COMPLETED                                     100
11.      IKEM NVOSI                    COMPLETED                                     100
12.      MBUTU/ UMUOKO            FINISHING                                        95
13.      AGBARANGWU 
           OTUKA                            COMPLETED                                      100
14.      UMUELEGHELE-
           ISIEKETA                         COMPLETED                                      100
15.      UMUHU-NVOSI               COMPLETED                                      100
16.      UGBA                               COMPLETED                                      100
17.      UMUOTIRI/ AMAEDE     COMPLETED                                      100

SCHOOL CONSTRUCTION AND RENOVATION
1.        COMMUNITY PRIMARY SCHOOL, UMUOMAINTA MBAWSI - 70%
2.        NGWA UKWU TECHNICAL SECONDARY SCHOOL                - 70%
3.        CONSTRUCTION OF A 6 CLASSROOM BLOCK WITH
           CONVENIENCES AT UMUODE NSULU PRIMARY SCHOOL  - 65%

TRANSFORMER DISTRIBUTION
1.        300KVA.33/0.415KVA     AMAORJI TOWN, NGWA UKWU
2.        300KVA.33/0.415KVA     ISIALA NGWA NORTH
3.        300KVA.33/0.415KVA     OBUBA NVOSI
4.        300KVA.33/0.415KVA     UMUNKALU NTIGHA
5.        300KVA.33/0.415KVA     AMAPU NGWA UKWU AUTONOMOUS
                                        COMMUNITY

8)        OBINGWA LOCAL GOVERNMENT AREA

ELECTRIFICATION PROJECTS
1) EXTENSION OF ELECTRICITY IN MGBOKO OKENGWU 
   AUTONOMOUS COMMUNITY (PHASE I & II)

HEALTH CENTRES
SNO    LOCATION          STATUS                                        % COMPLETED
1.        ISIALA NDU         COMPLETED & PAINTED           100
2.        UMUEZEIGBE      COMPLETED & PAINTED           100
3.        MGBOKO ANYA  COMPLETED & PAINTED           100
4.        MBANO NTIGHA 
           UZOR                   COMPLETED                                100
5.        EHERE                 COMPLETED                                 100
6.        ISIALA ITU          COMPLETED                                 100
7.       NDIAKATA           COMPLETED                                 100

SCHOOL CONSTRUCTION AND RENOVATION
1.        COMMUNITY SECONDARY SCHOOL                     - 55%
2.        OSAA COMMUNITY PRIMARY SCHOOL                - 30%
3.        IKALU/UMUELECHI COMMUNITY SCHOOL, 
           MGBOKO                                                                  - 65%
4.        COMMUNITY PRIMARY SCHOOL, ONICHA 
           NGWA                                                                       - 30%

TRANSFORMER DISTRIBUTION
1.        300KVA.33/0.415KV        ABALA AUTONOMOUS COMMUNITY
2.        300KVA.33/0.415KV        UMUORJI OHANZE COMMUNITY
3.        300KVA.33/0.415KV        OSUSU AMAUKWA
4.        300KVA.33/0.415KV        UMUOMEE COMMUNITY
5.        300KVA.33/0.415KV        EHERE AUTONOMOUS COMMUNITY
6.        300KVA.33/0.415KV        ITU NGWA
7.        300KVA Transformer        OGIDEUKWU VILLAGE


9)        OBINGWA LOCAL GOVERNMENT AREA

ELECTRIFICATION PROJECTS
EXTENSION OF ELECTRICITY (PHASE I & 2) AKASI UTUTU COMMUNITY

HEALTH CENTRES
SNO    LOCATION                  STATUS                                   % COMPLETED
1.        EZEMA UTUTU 
           OBEIENE                      COMPLETED & PAINTED             100
2.        ODUMACHIAKUMA    COMPLETED & PAINTED             100
3.        ETITI ABAM                COMPLETED & PAINTED              100
4.        MKPAKI UTUTU          COMPLETED                                  100
5.       ACHARA IHECHIOWA COMPLETED                                  100
6.       IDIMA ABAM                COMPLETED                                    60
7.       UTUGBUGWU              COMPLETED                                  100
8.       AMANAGWU               LINTEL LEVEL                                 70
9.       OBIEZE ISU                  COMPLETED                                   100
10.      IHEOSE ISU                 COMPLETED                                   100
11.      ABUBI UTUTU            LINTEL LEVEL                                  60

SCHOOL CONSTRUCTION AND RENOVATION
1.        ONYERUBI JUNIOR SECONDARY COMPREHENSIVE, NDI OJI ABAM
- COMPLETED
2.        MARY SLESSOR SECONDARY SCHOOL        - 10%
3.        ISU SECONDARY SCHOOL                              - 30%
4.        UMUNA ABUO PRIMARY SCHOOL, 
           IHECHIOWA                                                       - 30%

TRANSFORMER DISTRIBUTION
1.        300KVA.11/0.415KV        AROCHUKWU KINGDOM
2.        300KVA.11/0.415KV        ATANI ASA ETITI ABAM AUTO. COMMUNITY
3.        300KVA.33/0.415KV        AMUVI AROCHUKWU
4.        300KVA.33/0.415KV        NZUKO ABALI AROCHUKWU


10)      IKWUANO LOCAL GOVERNMENT AREA

ELECTRIFICATION PROJECTS
1.  EXTENSION OF ELECTRICITY TO USAKA ELEAGU COMMUNITY
    (PHASE I & II) IKWUANO
2) EXTENSION OF ELECTRICITY TO AZUIYI OLOKO (PHASE I & II)
3) REHABILITATION OF OBOHIA-IBERE ELECTRICITY
    - WORK IN PROGRESS

HEALTH CENTRES
SNO    LOCATION                            STATUS                        % COMPLETED
1.        ARIAM                                 FINISHING                                   80
2.        NGWUGWO IBERE             FINISHING                                   80
3.        NCHARA AKANU               COMPLETED                               100    
4.        NDIEKE IKEMBA                COMPLETED                               100
5.        IYALA IBERE                         FINISHING                                 80
6.        UMUDIKE UKWU I             COMPLETED                               100
7.        OKWE UKWU OBORO      COMPLETED                                100
8.        UMUADA NGODO
 IKWUANO                            COMPLETED & PAINTED          100

SCHOOL CONSTRUCTION AND RENOVATION
1.        COMPREHENSIVE SECONDARY SCHOOL, IBERE AHIA ORIE         
                                                                                                            - 80%

TRANSFORMER DISTRIBUTION
1.        300KVA.11/0.415KV        AMURO IBERE
2.        300KVA.11/0.415KV        AMAWOM OBORO
3.        300KVA.11/0.415KV        ABAUKWU AUTONOMOUS COMMUNITY
4.        300KVA.11/0.415KV        ORUIGWE OBORO COMMUNITY

ROAD CONSTRUCTION AND REHABILITATION
1.   CONSTRUCTION OF ARIAM USAKA-IKWUANO RING ROAD  
      - ONGOING


11)      UKWA EAST LOCAL GOVERNMENT AREA

ELECTRIFICATION PROJECTS
1)        REHABILITATION OF MKPOROBE ELECTRICITY PROJECT    
           - COMPLETED

HEALTH CENTRES
SNO    LOCATION                            STATUS                 % COMPLETED
1.        ISI MKPORODE                    COMPLETED                  100
2.        OHURU                                 FINISHING                         80
3.        UJURU OHANKU                  COMPLETED                   100
4.        OBUNKU-IKWUEKE             COMPLETED                   100
            EAST  
5.        AKIRIKA OBU-UMUIGUBE
ACHARA                                COMPLETED                     80
6.        OHANDU                              COMPLETED                    100
7.        OKOTOKO-OHANKU          FINISHING                         80
8.        OBA                                      FINISHING                         70

SCHOOL CONSTRUCTION AND RENOVATION
1.        OHURU PRIMARY SCHOOL                                      - 80%
2.        OBOHIA TOWN PRIMARY SCHOOL                         - 80%
3.        AKIRIKA UKU PRIMARY SCHOOL                            - 80%
4.        NATIONAL SECONDARY SCHOOL, AZUMINI          - 80%
5.        AKWETE SECONDARY SCHOOL                              - 80%
6.        OBOHIA SECONDARY SCHOOL                                - 80%

NO TRANSFORMERS



12)      BENDE LOCAL GOVERNMENT AREA

WATER PROJECTS
1.      CONSTRUCTION OF NEW WATER SCHEME AT NKWO AMIYI OKOKO ITEM, BENDE LGA
2.      CONSTRUCTION OF NEW WATER SCHEME AT THE NYSC 
         PERMANENT ORIENTATION CAMP, UMUNNATO

ELECTRIFICATION PROJECTS
1.  EXTENSION OF ELEECTRICITY TO ISIEKE AMAEGBUTO NKPA 
     AUTONOMOUS COMMUNITY
2.  EXTENSION OF ELECTRICITY TO OKPUHU NKPA AUTONOMOUS 
     COMMUNITY
3.  INSTALLATION OF TRANSFORMERS AT UZUAKOLI URBAN
4.  PURCHASE AND INSTALLATION OF 500KVA GENERATOR TO NYSC
     PERMANENT ORIENTATION SITE CAMP, UMUNNA

ROAD CONSTRUCTION AND REHABILITATION
1.  REHABILITATION/PATCHING OF UMUAHIA-ISIGBU-OZUITEM-IGBERE
     ROAD WITH ASPHALT      - COMPLETED
2.  REHABILITATION/PATCHING OF UZUAKOLI-OZUITEM-IGBERE ROAD
     WITH ASPHALT                 - COMPLETED
3.   EROSION CONTROL WORKS AT 2 SITES ALONG UZUAKOLI OZUITEM
     AGBUA ROAD – ONGOING
4.  REHABILITATION OF UMUAHIA-UZUAKOLI-OHAFIA ROAD AND THE
     CONSTRUCTION OF ANTI EROSION STRUCTURE – ONGOING

HEALTH CENTRES
SNO    LOCATION                        STATUS                                   % COMPLETED
1.        BENDE OVU                      COMPLETED & PAINTED           100
2.        UMUOKWE UMUHU/
 EZECHI                              LINTEL LEVEL                               60
3.        MBAA OZUITEM              FINISHING                                      80
4.        NGWU UZUAKOLI          COMPLETED & PAINTED              100
5.        EZEUKWU                        COMPLETED                                  100
6.        AMAEKPU ITEM               FINISHING                                      90
7.        AMANKALU IGBERE       COMPLETED                                 100
8.        AGBAMAIZU                    COMPLETED & PAINTED             100
9.        UBIBIA ITUMBAUZO    APPROACHING LINTEL LEVEL        45      
10.      AGBO AKOLI ALAYI       COMPLETED AND PAINTED         100
11.      LODU IMENYI                      COMPLETED                              100
12.      UMUHU EZEDI                     FINISHING                                    80
13.      ITUMBUZO                           FINISHING                                   80
 14.     UGWUEKE                            FINISHING                                   80
15.      AMAOJI IMENYI              COMPLETED & PAINTED              100

TRANSFORMER DISTRIBUTION
1.        300KVA.33/0.415KV        OKAGWE AUTONOMOUS COMMUNITY
2.        300KVA.33/0.415KV        UMUISI COMMUNITY IGBERE
3.        300KVA.33/0.415KV        UMUNNATO AKANU ITEM AUT. COMMUNITY
4.        300KVA.33/0.415KV        OKAL ITEM
5.        300KVA.33/0.415KV        AMAEKE ITEM
6.        300KVA.33/0.410KV        OKOPEDI AUTONOMOUS COMMUNITY
7.        300KVA.33/0.410KV        IBENE ANCIENT KINGDOM
8.        300KVA.33/0.410KV        AKANU NKPA COMMUNITY
9.        300KVA.11/0.415KV        OKPUHU UMUORIE COMMUNITY
10.      300KVA.33/0.415KV        URBAN NEW LAYOUT, UZUAKOLI
11.      300KVA.33/0.415KV        AMAIYI AHABA IMENYI AUTONOMOUS
12.      300KVA.33/0.415KV        APANU ITEM
13.      300KVA.33/0.415KV        AMAOFULE IGBERE
14.      300KVA.33/0.415KV        ISIEKE AMAEGBUATO AUTO. COMMUNITY
15.      300KVA.33/0.415KV        AKANU ITEM COMMUNITY
16.      300KVA.33/0.415KV        AMUTU AUTONOMOUS COMMUNITY
17.      300KVA.33/0.415KV        AKPANAGBO AUTONOMOUS COMMUNITY
18.      300KVA.33/0.415KV        IBINA COMMUNITY VIA ABARA
19.      300KVA.33/0.415KV        IBIANUKWU IGBERE
20.      300KVA.33/0.415KV        UMUAKPA AUTONOMOUS COMMUNITY
21.      300KVA.33/0.415KV        AMAOHORO NKPA
22.      300KVA.33/0.415KV        UMUISI/ OKAFIA IGBERE COMMUNITY
23.      300KVA.33/0.415KV        OKAFIA AUTONOMOUS COMMUNITY
24.      300KVA.33/0.415KV        NDI OJI ABAM COMMUNITY
25.      300KVA.33/0.415KV        ISIALA ITEM AUTONOMOUS COMMUNITY

SCHOOL CONSTRUCTION AND RENOVATION
1.        ITEM HIGH SCHOOL                                              - 80%
2.        AMORJI IMENYI PRIMARY SCHOOL                    - 80%
3.        CONSTRUCTION OF SIX CLASSROOM BLOCKS
WITH CONVENIENCES AT UMUENYERE ALAYI 
PRIMARY SCHOOL                                                    -30%
4.        AMAOHORO NKPA PRIMARY SCHOOL                 -10%


13)      UMUAHIA LOCAL GOVERNMENT AREA

WATER PROJECTS
1. ON-GOING REHABILITATION OF OLOKORO WATER SCHEME, UMUAHIA

ELECTRICITY PROJECTS
1. EXTENSION OF ELECTRICITY (PHASE I 7 II) TO UMUOHU, OKPUALA,  
    NDUME IBEKU, UMUAHIA SOUTH
2. EXTENSION OF ELECTRICITY TO UMUOSU COMMUNITY, UMUAHIA
    SOUTH

ROADS CONSTRUCTION
1. DUALIZATION OF OLD UMUAHIA-UBAKALA ROAD - ONGOING
2. REHABILITATION/ REPAIR OF UMUIMO ROAD         - ONGOING
3. REHABILITATION AND FLOOD CONTROL/ DRAINAGE AT UBAKALA
    EXPRESSWAY JUNCTION, NSIRIMO ROAD, UMUAHIA – ONGOING

HEALTH CENTRE PROJECTS
SNO    LOCATION                                    STATUS                                            
1.        DIKEUKWU EKENOBIZI               ONGOING 
2.        AMUZU UBAKALA                        COMPLETED & PAINTED             
3.        UMUOKORODU EZELEKE            COMPLETED & PAINTED
4.        NENU                                              COMPLETED
5.        IPUPE                                              COMPLETED & PAINTED
6.        OLD UMAHIA, UMUOBOTO         COMPLETED & PAINTED
7.        AMAKAMA                                     COMPLETED & PAINTED
8.        UMUOBIA-OLOKORO                   COMPLETED & PAINTED
9.        UMUTOWE (ITAJA & AMUZU)     COMPLETED & PAINTED
10.      UMUAJATA OLOKORO                  COMPLETED & PAINTED
11.      UMUANYA                                       LINTEL LEVEL
12.      ELUGWU UMUORAM-OHIYA       COMPLETED
13.      IBE/ UMUODO                                FINISHING
14.      ABAM ALAOCHA UBAKALA         LINTEL LEVEL
15.      NSUKWE UBAKALA                       COMPLETED & PAINTED

SCHOOLS CONSTRUCTION & RENOVATION
1.        SANTA CRUX SECONDARY SCHOOL,OLOKORO       - 70%
2.        COMMUNITY SECONDARY SCHOOL, NSIRIMO         - 75%

TRANSFORMER’S DISTRIBUTION
1.        1,000KVA.33/0.4KV         UCL-MODERN CERAMICS INDUSTRIES
2.        1,000KVA.33/0.4KV         UVUOMA MICROFINANCE BANK, OLOKORO
3.        1,000KVA.33/0.4KV         AGBAMA WORLD BANK HOUSING ESTATE,
   UMUAHIA
4.        1,000KVA.33/0.4KV         ITAJA OLOKORO COMMUNITY
5.        1,000KVA.33/0.4KV         DIM NA OPARA ANCIENT KINGDOM
6.       1,000KVA.33/0.4KV          OLD UMUAHIA/UMUOBUTU
                                                   /AMUZUTA/OKWU COMMUNITIES
7.        3000KVA                         FRCN PACESETTER FM, UMUAHIA
8.        300KVA.11/0.415KV        AGBAMA HOUSING ESTATE
9.        300KVA.11/0.415KV        BRO UCHENNA EMEZUE, EZIAMA OSSAH
10.      300KVA.11/0.415KV        OLD UMUAHIA/UMUOBUTU/AMUZATA/OKWU
11.      300KVA.11/0.415KV        ITAJA OLOKORO, UMUAHIA SOUTH
12.      300KVA.11/0.415KV        OLOKORO CENTRAL COMMITTEE
13.      300KVA                           ITAJA OLOKORO, UMUAHIA SOUTH


14)      UMUAHIA NORTH LOCAL GOVERNMENT AREA

WATER PROJECTS
1. ONGOING REHABILITATION OF AFUGIRI WATER SCHEME
2. CONSTRUCTION OF NEW WATER SCHEME AT COMMISSIONER’S
    QUARTERS
3. CONSTRUCTION OF NEW WATER SCHEME AT THE NNAMDI AZIKIWE’S 
    SECRETARIAT, UMUAHIA
4. REACTIVATION OF UMUAHIA URBAN WATER WORKS (OVERHEAD
    WATER RESERVOIR FIR STEADY WATER SUPPLY)

ELECTRIFICATION PROJECTS
1. EXTENSION OF STREET LIGHTS TO NKATA IBEKU TO ISIEKE PRIMARY
    SCHOOL (ISIEKE EBUKU), UMUAHIA NORTH
2. CONNECTION OF 500KVA GENERATING SET AT COMMISSIONER’S
    QUARTERS, UMUAHIA NORTH
3. CONSTRUCTION OF SOLAR STREET LIGHTS IN UMUAHIA
    METROPOLIS, UMUAHIA NORTH
4. PROCUREMENT AND INSTALLATION OF 4 X 100KVA GENERATING SET,
    UMUAHIA METROPOLIS
5. STREET LIGHT AT EHIMIRI HOUSING ESTATE – COMPLETED
6. REHABILITATION OF STREET LIGHTS IN UMUAHIA METROPOLIS
7. INSTALLATION OF TRANSFORMER AT OHOKOBE – 
    AFARAUKWU,WORLD BANK HOUSING ESTATE
8. INSTALLATION OF STREET LIGHTS IN ALL MAJOR STREETS IN ABA 
    AND UMUAHIA

ROAD CONSTRUCTION AND REHABILITATION
1. CONSTRUCTION OF LINK ROAD BETWEEN OWERRI AND UMUWAYA
    EXTENSION ACROSS RAILWAY, UMUAHIA – 80% COMPLETION
2. REHABILITATION OF A SECTION OF UWALAKA STREET AND FLOOD
    CONTROL ON UWALAKA AND IBEKU STREET, UMUAHIA – 70% 
    COMPLETION
3. REHABILITATION OF LINK ROAD BETWEEN WORLD BANK HOUSING
    ESTATE AND ABA ROAD – ONGOING
4. CONSTRUCTION OF LINK ROAD BETWEEN ABA ROAD AND AFARA 
    ROAD – ONGOING.
5. CONSTRUCTION OF AHIAEKE-UMUHUTE-AMUZUORO-ISIEKE OKWUTA 
    ROAD – ONGOING
6. SUPPLY AND INSTALLATION OF INTERLOCKING STONES ALONG
    UMUWAYA ROAD - ONGOING
7. CONSTRUCTION OF MGBAJA-ORIEOJI ROAD – ONGOING
8. CONSTRUCTION OF 3NOS ROADS IN UMUAHIA VIZ: UMUANA 1ST GATE
    UMUANA-AHIAEKE AND IBB GRA – ONGOING
9. DEMOLITION AND RECONSTRUCTION OF DRAINS ON BOTH SIDES OF
    ABA ROAD, UMUAHIA (PHASE I) - COMPLETED
10. CONSTRUCTION OF CONCRETE DRAINS ALONG T.A. ROAD (UPPER 
      PART) UGBA IBEKU, -COMPLETED
11. PAINTING OF ROAD MEDIAN AND KERBS (FROM ABIA TOWER TO 
     OKPARA SQUARE) – COMPLETED
12. CONSTRUCTION AND BEAUTIFICATION OF ROUNDABOUT AT ABA 
      ROAD BY OLD UMUAHIA RAILWAY CROSSING – COMPLETED
13. EMERGENCY ROAD, MTCE WORKS AT P.W. WATER BOREHOLE
     (POLICAP OBI WATER AND U.G. WATER) – COMPLETED
14. ASPHALT OVERLAY OF SIR CYRIL IBETO DRIVE, UCHE AND SIRGIN 
      CLOSE, UMUAHIA - COMPLETED
15. RENOVATION OF THE HONOURABLE COMMISSIONER’S QUARTERS – 
      COMPLETED
16. CONSTRUCTION OF EARTH ROAD TO LOCAL GOVERNMENT

      SECRETARIAT AT GOVERNMENT STATION LAYOUT UMUAHIA – 
      COMPLETED
17.  PATCHING OF POTHOLES ON CLUB ROAD, UMUAHIA – COMPLETED
18.  RECONSTRUCTION of ROUNDABOUT AT WARRI STREET BY 
      UMUWAYA ROAD/ REPLACEMENT OF BROKEN INTERLOCKING SLABS 
      FROM POST OFFICE TO ISI-GATE – COMPLETED
19. PAINTING OFTHE ROAD DIVIDERS AND END SIDE KERBS OF DRI. ORJI 
      UZOR KALU ROADS, PHASE 1 AND 2 AND AGUIYI IRONSI LAYOUT 
      ROAD – COMPLETED
20. REPAIR OF FAILED SECTIONS OF FIRST GATE EHIMIRI AND OPPOSITE 
      ZONE 9 POLICE HQ AND CUSTOMS OFFICER AT EHIMIRI HOUSING 
      ESTATE, UMUAHIA – COMPLETED
21. REHABILITATION OF CERAMIC FACTORY ROAD NETWORK – 
      COMPLETED
22. EMERGENCY ROAD MTCE AT ABA ROAD FROM TOTAL FILLING
      STATION, ABA ROAD TO CITY GATE MORTUARY, UMUAHIA – 
      COMPLETED
23. EMERGENCY ROAD, MTCE, WORKS DONE AT UMUAHIA – IKOT 
      EKPENE ROAD, UMUAHIA –COMPLETED
24. PAINTING OF ROAD MEDIAN AND KERBS FROM OKPARA TO FMC 
      ROUNDABOUT – COMPLETED
25. CONSTRUCTION OF CONCRETE DRAIN ALONG T.A. ORJI ROAD 
      (LOWER PART) UGBA IBEKU, UMUAHIA – COMPLETED
26.  REHABILITATION AND ASPHALT OVERLAY OF OKPARA SQUARE, 
       LIBRARY AVENUE AND IBIAM ROAD – COMPLETED
27.  ASPHALT OVERLAYIN OF NINE NO. ROADS, UMUAHIA TOWNSHIP – 
       ONGOING
28.  CONSTRUCTION OF AFAAUKWU ROAD, ADDITIONAL DRAINAGE 
       STRUCTURE, UMUAHIA – ONGOING
29.  CONSTRUCTION OF OPEN DRAIN AND CROSS-OVER SLABS 
       ALONG WINNERS CHAPEL ROAD, UMUAHIA
30. CONSTRUCTION OF OPEN DRAIN AND CROSS OVER SLABS ALONG 
      TIMBER/OLOKORO ROAD (FROM OHOBO AFARA JUNCTION TO 
      OLOKORO) – ONGOING.
31. REHABILITATION OF CULVERTS, DRAINAGES/ DRAINAGE COVER AND
      ROADS AT EZE OGBULAFOR AFARA AND UMUOBASI ROADS – 
      ONGOING.
32. REHABILITATION AND ASPHALT OVERLAY OF 8NOS TOWNSHIP 
      ROADS IN UMUAHIA – TERMINATED).
33. REHABILITATION OF CULVERTS, DRAINAGES/ DRAINAGE COVER AND

      ROADS AT EZE OGBULAFOR AFARA AND UMUOBASI ROADS – 
      ONGOING.
34. ASPHALT OVERLAY OF IBIAMA/ LIBRARY AVENUE ROAD TO OKPARA 
      ROUNDABOUT, UMUAHIA – COMPLETED.
35. CONSTRUCTION OF EKEBEDI-UMUISI-AMAPU ROAD – ONGOING.
36. CONSTRUCTION OF NKATA AMAEKE IBEKU ROAD – 95% -ONGOING.
37. CONSTRUCTION OF DUAL CARRIAGE LINK BETWEEN NEW 
      GOVERNMENT HOUSE LAYOUT AND IKOT EKPENE ROAD AT NDUME
      –ONGOING.
38. ACCESS ROAD TO JAAC/NDI-EZE SECRETARIAT, UMUAHIA – 
     ONGOING.
39. CONSTRUCTION OF OHOKOBE AFARA-UMUOBIA ROAD, UMUAHIA 
      – ONGOING.
40. CONSTRUCTION OF AMAOBA NNONO ROAD – ONGOING.
41. CONSTRUCTION OF UMUOKOROKWU AMAFOR BYE PASS, UMUAHIA
      –ONGOING.
42. OFEME UMUAHIA NORTH – COMPLETED AND PAINTED -100%.
43. CONSTRUCTION OF OGWUMABIRI-UMUCHIMA ROAD, UMUAHIA 
      – ONGOING.
44. CONSTRUCTION OF OKPARA ROAD – ONGOING.
45. CONSTRUCTION OF TIMBER ROAD VIA ABIA TRANSPORT 
      CORPORATION – ONGOING.
46. CONSTRUCTION OF UMUCHUKWU-OHOKOBE AFARA UMUOBIA 
     ROAD – ONGOING.
47. CONSTRUCTION OF AMAUHIE-UMUNKAZU UMUOKEHI OKPULA-
      AFUIRI ROAD – ONGOING.
48. CONSTRUCTION OF UGWUNCHARA ROAD, UMUAHIA – ONGOING.
49. CONSTRUCTION OF UMUEKWULE-UMUKABIA-AMAOGWUGWU 
      ROAD, UMUAHIA – ONGOING.
50. CONSTRUCTION OF UMUAHIA UMEZE AGBO-UBANI IBEKU 
      MODERN MARKET ROAD – ONGOING.
51. CONSTRUCTION OF UKEGBU/ENYI OGBULAFOR, UMUAHIA – 
     ONGOING.
52. CONSTRUCTION OF ENYIUKWU/AFARA ROAD, UMUAHIA – ONGOING.
53. CONSTRUCTION OF NKATA-ALIKE-UMUKABIA ROAD, UMUAHIA – 
     ONGOING.
54. CONSTRUCTION OF UMUAFIA WORLD BANK FEDERAL HOUSING 
     LOW COST SCHEME ROAD – ONGOING.
55. CONSTRUCTION OF LINK ROAD BETWEEN TIMBER OLOKORO AND 
     ABA ROAD – ONGOING.
56. REHABILITATION OF AMUHIE-UMUOKEHI-OKPUALA-AFUGIRI ROAD.
57. CLEANING OF ENUGU – PORT HARCOURT EXPRESSWAY MEDIAN.
58. DUALIZATION OF ROADS FOR EASY TRAFFIC IN UMUAHIA. SUCH 
     ROADS INCLUDE: LIBRARY AND AKANU IBIAM WAY.
59. PAVING OF WALKWAYS AND PLANTING OF ORNAMENTALS TO 
     BEAUTIFY ABIA ROADS.
60. CONSTRUCTION OF ISIEKE-OKWUTA-AHIAEKE ROAD
61. AESTHETIC RENOVATION AND REMODELING OF ALL MONUMENTS IN 
      ABIA STATE SUCH AS EMODELING ABIA TOWER IN UMUAHIA.
62. CONSTRUCTION OF ISIEKE-AHIAEKE ROAD WITH SPUR TO 
     CENOTAPH, UMUAHIA – COMPLETED.
63. DUALIZATION OF UMUAHIA OSSAH ROAD, UMUAHIA – COMPLETED.
64. CONSTRUCTION OF UMUAHIA UMEZE AGBO-UBANI IBEKU MODERN 
      MARKET ROAD–ONGOING.
65. CONSTRUCTION OF ISIEKE-AHIAEKE ROAD WITH SPUR TO 
      CENOTAPH, UMUAHIA – COMPLETED.
66. DUALIZATION OF UMUAHIA OSSAH ROAD, UMUAHIA – COMPLETED.
67. CONSTRUCTION OF MEDIAN/R.C. LANE DIVIDER ALONG LIBRARY 
      AVENUE, UMUAHIA – COMPLETED.
68. BEAUTIFICATION OF UMUWAYA ABA ROAD, UMUAHIA – COMPLETED.
69. CONSTRUCTION OF INTERNAL ROADS OF ABIA HOUSE OF 
      ASSEMBLY– COMPLETED.
70. CONSTRUCTION  OF ABAM ROAD EXTENSION UPTO ORIE 
      UGBA MARKET – COMPLETED.
71. CONSTRUCTION OF UMUOVOM-NKATA NEW GOVERNMENT STATION
      LAYOUT – COMPLETED.
72. CONSTRUCTION OF CONCRETE DRAINS ALONG UPPER T.A. ORJI 
      ROAD, UGBA IBEKU – COMPLETED.
73. CONSTRUCTION OF UDEKWU/ACHINA CLOSE, UMUAHIA – 
      COMPLETED.
74. CONSTRUCTION OF IBEKU ROAD EXTENSION, UMUAHIA – 
     COMPLETED.
75. CONSTRUCTION OF UMUAHIA – UMUANA AHIAEKE NDUME ROAD, 
     UMUAHIA – 96% COMPLETED.
76. CONSTRUCTION OF ORIE-UGBA, UMUAHIA – ONGOING.
77. CONSTRUCTION OF AMUZUKWU UMUEZEAGWU BY RAILWAY LANE 
     CROSSING – ONGOING.
78. CONSTRUCTION OF CONCRETE COVER DRAINS ALONG CYRIL IBETO 
      STREET – COMPLETED.
79. CONSTRUCTION OF UWALAKA ROAD FROM ENUGU JUNCTION TO 
     ORIE UGBA MARKET, UMUAHIA – COMPLETED.
80. CONSTRUCTION OF OBORO STREET, UMUAHIA – COMPLETED.
81. CONSTRUCTION OF UDI STREET, UMUAHIA – COMPLETED.
82. CONSTRUCTION OF OBOWU STREET, UMUAHIA – COMPLETED.
83. CONSTRUCTION OF AHIA-ISIAMA AFARA ROAD, UMUAHIA – 
     ONGOING.
83.CONSTRUCTION OF OZUITEM STREET, UMUAHIA – COMPLETED.
84. CONSTRUCTION OF UKAEGBU/ENYI OGBULAFOR, UMUAHIA – 
      ONGOING.
85. CONSTRUCTION OF ENYIUKWU/AFARA ROAD, UMUAHIA – ONGOING.
86. CONSTRUCTION OF NKATA-ALIKE-UMUKABIA ROAD – ONGOING.
87. CONSTRUCTION OF UMUAFIA WORLD BANK FEDERAL HOUSING 
      LOW COST SCHEME ROAD – ONGOING.
88. CONSTRUCTION OF LINK ROAD BETWEEN TIMBER OLOKORO AND 
      ABA ROADS – ONGOING.
89. REHABILITATION OF LINK ROAD BETWEEN WORLD BANK HOUSING 
      ESTATE AND ABA ROAD – ONGOING.
90. CONSTRUCTION OF LINK ROAD BETWEEN ABA ROAD AD AFARA 
      ROAD – ONGOING.
91. CONSTRUCTION OF AHIAEKE-UMUHITE-AMUZUORO-ISIEKE OKWUTA 
      ROAD – ONGOING.
92. SUPPLY AND INSTALLATION OF INTERLOCKING STONES ALONG 
      UMUWAYA ROAD, UMUAHIA –ONGOING.
93. CONSTRUCTION OF MGBAJA-ORIEOJI ROAD, UMUAHIA – ONGOING.
94. CONSTRUCTION OF 3NOS ROADS VIZ: UMUANA 1ST GATE UMUANA – 
     AHIAEKE AND IBB GRA – ONGOING.
95. DUALIZATION OF OLD UMUAHIA-UBAKALA ROAD – ONGOING.

GENERAL PROJECTS
1. COMPLETION OF STAFF QUARTERS FOR JUNIOR STAFF OF 
    GOVERNMENT HOUSE, UMUAHIA.
2. COMPLETION OF THE DEVELOPMENT HOUSE HEADQUARTERS OF THE 
    ABIA STATE PLANNING COMMISSION.
3. FOUNDATION STONE LAYING OF THE ULTRA MODERN ABIA STATE 
    SECRETARIAT COMPLEX FOR CIVIL SERVANTS.
4. FOUNDATION STONE LAYING OF THE NEW UMUAHIA MAIN MARKET 
   AT UBANI IBEKU COMPLETION OF NYSC PERMANENT SITE, 
   UMUNNEATO.
5. REVITALIZATION OF MODERN CERAMICS UMUAHIA. PARTNERING 
    WITH SOME FOREIGN INVESTORS WITH A VIEW TO BUILDING A FIVE 
    STAR HOTEL AT THE ABIA HOTELS, UMUAHIA PREMISES – ONGOING.


HEALTH CENTRES
SNO.  LOCATION                                        STATUS
1.        AMAOKWE UGBA IBEKU              100% COMPLETED
2.        OKAIUGA NKWOEGWU                100% COMPLETED
3.        AHIAEKE NDUME IBEKU               100% COMPLETED
4.        UMUNSO EKEOKWURU                100% COMPLETED
5.        EZIAMA OSSAH                              100% COMPLETED
6.        LODU NDUME                                 100% COMPLETED
7.        UHUOKWU-EKEOBA                      100% COMPLETED
8.        UHUMGBOOKWO-ISINGWU         100% COMPLETED
9.        OKPU ISINGWU                              100% COMPLETED
10.      EGWU UKWU UMUEGWU             100% COMPLETED
11.      AMAEKE AFARATA                         100% COMPLETED
12.      UMUEZEAMA OFOEME                  100% COMPLETED
13.      UMUDA ISINGWU                           100% COMPLETED
14.      AMUZU ORO AMAFORO
IBEKU                                                 80% COMPLETED

SCHOOLS CONSTRUCTION AND RENOVATION
1. AHIA EKE JUNIOR SECONDARY SCHOL, UMUHIA    - COMPLETED
2. UMUAWA ALOCHA PRIMARY SCHOOL                       - COMPLETED
3. IBEKU HIGH SCHOOL                                                    - COMPLETED
4. UGBA PRIMARY SCHOOL                                             - COMPLETED
5. MBOM IBEKU SECONDARY SCHOOL                          - COMPLETED
6. UMUANA NDUME PRIMARY SCHOOL                         - 50% COMPLETED
7. AJATANA IYIENYI PRIMARY SCHOOL                         - 85% COMPLETED
8. HOLY ROSARY SECONDARY SCHOOL                        - COMPLETED
9. AMUZUKWU PRIMARY SCHOOL                                  - 65%

ELECTRICITY PROJECTS
1.   INSTALLATION OF 154 UNITS OF SOLAR STREET LIGHTNING 
     AT EHIMIRI/ WINNERS ROAD, UMUAHIA    - 80% COMPLETED.

TRANSFORMER DISTRIBUTION
1.        300KVA.11/0.415KV        UMUNEZU IBEKU
2.        300KVA.11/0.415KV        UMUNEE AFUGIRI COMMUNITY
3.        300KVA.11/0.415KV        UMUEKWULE AFUGIRI COMMUNITY
4.        300KVA.11/0.415KV        UMUOKPU OSSAH
5.        300KVA.11/0.415KV        FEDERAL LOW COST HOUSING COST
6.        300KVA.11/0.415KV        IHITE UDE OFEME
7.        300KVA.11/0.415KV        OKWUTA ISIEKE IBEKU DEV. UNION
8.        300KVA.11/0.415KV        OUK HOUSING ESTATE
9.        300KVA.11/0.415KV        UMUOSU/ LAYOUT COMMUNITY
10.      300KVA.11/0.415KV        BCA, UMUAHIA
11.      300KVA.11/0.415KV        EGHEM LAYOUT, UMUAHIA
12.      300KVA.11/0.415KV        ISIADU AFARATA IBEKU, UMUAHIA
13.      300KVA.11/0.415KV        UMUAGOM IBEKU BY ORIE UGBA ROAD
14.      300KVA.11/0.415KV        UMUKAKA IBEKU
15.      300KVA.11/0.415KV        AJATA ISIEKE COMMUNITY
16.      300KVA.11/0.415KV        AMOFOR ISIUGWU COMMUNITY
17.      300KVA.11/0.415KV        AMAOKWE UGBA IBEKU AUTO. COMMUNITY
18.      300KVA.11/0.415KV        OUK HOUSING ESTATE, EHIMIRI, UMUAHIA
19.      300KVA.11/0.415KV        AZUEKE IBEKU AUTO. COMMUNITY
20.      300KVA.11/0.415KV        AMUZUKWU IBEKU UMUAHIA NORTH
21.      300KVA.11/0.415KV        NGBOKO ISIAMA AFARAUKWU
22.      300KVA.11/0.415KV        AHIEKE NDUME, AZUEKE AUTO. COMM.
23.      300KVA.11/0.415KV        AMUZUORO AMFORO IBEKU AUTO. COMM.
24.      300KVA.11/0.415KV        UMUEGWU, OKPALA AUTO. COMMUNITY
25.      300KVA.11/0.415KV        UMUOKO COMMUNITY, AMUZUKWU IBEKU
26.      300KVA.11/0.415KV        KOLPING SOCIETY OF NIGERIA
27.      300KVA.11/0.415KV        AHIA ORIE UGBA ROAD
28.      300KVA.11/0.415KV        MINISTRY OF LOCAL GOVT & CHIEFTAINCY
  AFFAIRS
29.      300KVA.11/0.415KV        EGHEM LAYOUT CLOSE/ BCA ROAD
30.      300KVA.11/0.415KV        UMUMUKWU NKATA AFARATA IBEKU
31.      300KVA.11/0.415KV        UMUEZEHIE UMUWAYA AMUZUKWU


15 & 16) ABA NORTH AND SOUTH LOCAL 
               GOVERNMENT AREAS

WATER PROJECTS
1.        CONSTRUCTION OF NEW WATER SCHEME AT THE COMMON FACILITY CENTRE, ABA

ELECTRIFICATION PROJECTS
1.        EXTENSION OF ELECTRICITY TO LEATHER/ GARMENTS, COMMON FACILITY CENTRE, ABA NORTH.

ROAD CONSTRUCTION AND REHABILITATION
1. REHABILITATION OF EHI, EHERE, AZIKIWE & ASA ROAD, ABA – 30% 
    COMPLETION
2. REHABILITATION OF MILVERTON, MOSQUE/ CLIFFORD AND HOSPITAL 
    ROAD, ABA – ONGOING
3. REHABILITATION OF PARK, OMOBA, OLD COURT AND OKIGWE ROAD,
    ABA – 10% COMPLETION.
4. REHABILITATION OF UMUOLA, UKAEGBU, ST. MICHAELS AND POUND 
    ROADS, ABA – 20% COMPLETION.
5. REHABILITATION OF UMUOJIMA, UMULE AND UMUOCHAM ROADS, 
    ABA – COMPLETED.
6. REHABILITATION OF OOMNE DRIVE, OHANKU ROAD, MOSQUE STREET 
    & MCC ROAD, ABA – 30% COMPLETION.
7. REHABILITATION OF CEMETERY, GEROGES AND NGWA ROADS, ABA – 
    30% COMPLETION.
8. REHABILITATION OF EAST STREET AND OSUSU ROAD, ABA – 30% 
    COMPLETION.
9. CONSTRUCTION OF OUR LADY LOURDES ROAD, ABA – 90% 
    COMPLETED.
10. FLOOD CONTROL PROJECT AT UKWU MANGO, ARIARIA – ONGOING.
11. CONSTRUCTION OF ‘A’ LINE ROAD IN ARIARIA MARKET – 
     COMPLETED.
12. CONSTRUCTION OF IKONNE STREET, ABA – COMPLETED.
13. CONSTRUCTION OF ‘F’ LINE ROAD, ABA IN ARIARIA MARKET, ABA – 
      COMPLETED.
14. CONSTRUCTION OF TIMBER AND ALLIED PRODUCTS MARKET ROAD, 
      ABA – ONGOING.
15. CONSTRUCTION OF URATTA ROAD, ABA – ONGOING.
16. CONSTRUCTION OF MKPOROBE-OHANKU ROAD –ONGOING.
17. RECONSTRUCTION AND EXPANSION OF BRASS/ FAULKS ROAD, ABA 
      – ONGOING.
18. CONSTRUCTION OF OKWU AVENUE, ABA – ONGOING.
19. BEAUTIFICATION OF EXPRESSWAY FROM TONIMAS TO ARIARIA 
      JUNCTION, ABA – ONGOING.
20. RECONSTRUCTION OF PORT HARCOURT ROAD, ABA – ONGOING.
21. CONSTRUCTION OF ABA-OBIKALA ROAD – ONGOING.
22. GRASSING AND KERBING OF CENTRAL ROAD VERGES FROM 
      ARIARIA TO UGWUNAGBO NEPA JUNCTION ALONG ENUGU-PH ROAD, 
      ABA – ONGOING.
23. PATCHING OF FAILED SECTIONS OF NGWA ROAD, ABA – COMPLETED.
24. PATCHING AND REHABILITATION OF FAILED PORTIONS OF JUBILEE 
      AND HOSPITAL ROADS, ABA – COMPLETED.
25. REPAIR OF UMUOJIMA ROAD, ABA – COMPLETED.
26. REHABILITATION OF NWOGU/UKONU, AJAGBA, AJIWE STREET, ABA – 
      COMPLETED.
27. REHABILITATION OF ADAZI AND OKWUNUKA ROAD, ABA – 90% 
      COMPLETED.
28. REPAIR OF EAST STREET ROAD, ABA – COMPLETED.
29. REPAIR OF UMULE ROAD, ABA – COMPLETED.
30. REHABILITATION AND PATCHING OF POTHOLES ALONG QUEENS AND 
      OCHEFU ROADS, ABA – COMPLETED.
31. INSTALLATION OF REFLECTIVE STREET SIGN POSTS IN ABIA STATE 
      –COMPLETED.
32. EMERGENCY REPAIR OF OBOHIA AND OLD COURT ROADS, ABA 
      OBOHIA ROAD – COMPLETED.
33. REHABILITATION OF UMULE BY TONIMAS JUNCTION, ABA – 
      COMPLETED.
34. EMERGENCY ROAD MTCE WORKS DONE AT NWAMKPA STREET AND 
     CEMETRY ROAD, ABA – COMPLETED.
35. EMERGENCY ROAD MTCE WORKS DONE AT URATTA, PORT 
     HARCOURT ROAD TO AP FILLING STATION AND OPOBO JUNCTION, 
     ABA – COMPLETED.
36. EMERGENCY REPAIR OF ABA-OWERRI ROAD BY IMMACULATE 
      HEART JUNCTION, UMUNGASI, ABA – COMPLETED.
37. EMERGENCY ROAD MAINTENANCE WORK DONE AT ABA FROM 
      BRASS JUNCTION TO ‘A’ LINE GATE, ARIARIA MAIN MARKET, ABA – 
      COMPLETED.
38. EMERGENCY ROAD, MAINTENANCE WORK DOWN AT ABA (3RD 
      PHASE) FROM OPPOSITE AFRIBANK GATE TO SKYE BANK – 
      COMPLETED.
39. REHABILITATION OF MILVERTON AND HOSPITAL ROADS, ABA – 
      ONGOING.
40. REHABILITATION OF EHI, EHERE, AZIKIWE AND ASA ROADS, ABA – 
      ONGOING.
41. REHABILITATION OF PARK, OMOBA, OLD COURT AND OKIGWE 
      ROADS, ABA – ONGOING.
42. REHABILITATION OF OSUSU ROAD, ABA – ONGOING.
43. REHABILITATION OF FAILED ROADS IN ABA (AZIKIWE ROAD AND 
      MILVERTON AVENUE) ABA – ONGOING.
44. PATCHING OF FAILED SECTIONS OF UMUOCHAM/ UMUEHILEGU, ABA 
      – ONGOING.
45. FENCING OF MINISTRY OF WORKS AND PREMISES, ABA – 
      ONGOING.
46.  MTCE OF STRATEGIC ROADS IN ABA-NGWA-NDOKI DAFODO, ETCHE 
      AND SCHOOL ROADS,, ABA – ONGOING.
47. MTCE OF CEMETRY, ABA, IKOT EKPENE AND UNITY ROAD, 
      MILVERTON AVENUE AND EAST STREET, ABA ONGOING.
48. MTCE OF STRATEGIC ROADS IN ABA, BRASS STREET OKIGWE, 
      EZIUKWU, OSUSU ROADS, ABA AND GOLF COURSE TUNNEL – 
      ONGOING.
49. EMERGENCY REPAIR OF ASA EZIAMA HIGH SCHOOL ROADS – 
      ONGOING.
50. REHABILITATION AND ASPHALT OVERLAY OF AZIKIWE ROAD, ABA – 
      ONGOING.
51. CONSTRUCTION OF MARGARET AVENUE EXTENSION, ELIZABETH 
      AVENUE EXPANSION AND ORON ROAD, ABA – ONGOING.
52. CONSTRUCTION ADDITIONAL DRAINS ON ABA-UMUAHIA NEW ROAD, 
      (URURUKA ROAD) – ONGOING.
53. REPAIRS/ REHABILITATION OF NGOZI AVENUE, ABA – ONGOING.

TRANSFORMERS DISTRIBUTION
1.        300KVA.11/0.415KV        EZE IKONNE AND ENVIRONMENTS
2.        300KVA.11/0.415KV        EHERE COMMUNITY, ABA
3.        300KVA.11/0.415KV        ESIAGWU COMMUNITY, ABA
4.        300KVA.11/0.415KV        AKPAA ROAD MARKET, ABA
5.        300KVA.11/0.415KV        NGWA ROAD MARKET, ABA
6.        300KVA.11/0.415KV        AZUKA EXTENSION/ ACHI AVENUE, ABA
7.        300KVA.11/0.415KV        OVOM/ AEAUNM/ AROCHUKWU RD, OGBOR
   HILL, ABA
8.        300KVA.11/0.415KV        OKORO ROAD LANDLORDS ASSOCIATION
9.        300KVA.11/0.415KV        ANANABA STREET RESIDENTS ASSOCIATION
10.      300KVA.11/0.415KV        EGEBELU COMMUNITY, ABA
11.      300KVA.11/0.415KV        ABIA POLYTECHNIC, ABA
12.      300KVA.11/0.415KV        AHUNNAYA RESIDENTS ASSOCIATION
13.      300KVA.11/0.415KV        UMUOSU OWERRI/ ABA VILLAGE
14.      300KVA.11/0.415KV        UMUNGASI, ABA
15.      300KVA.33/0.415KV        URUAKPA/ ERONDU ROAD, ABA
16.      300KVA.33/0.415KV        LANDLORDS ASSOCIATION, UMUDE
17.      300KVA.33/0.415KV        EGEBELU COMMUNITY, ABA
18.      300KVA.11/0.415KV        DEAR JOHN CLOSE, ABA
19.      300KVA.11/0.415KV        ST.MICHAEL’S ANGLICAN CHURCH,, ABA
20.      300KVA.11/0.415KV        ETITI OHAZU, ABA SOUTH
21.      300KVA.33/0.415KV        RIVER LAYOUT, EAST STREET, ABA
22.      300KVA.33/0.415KV        UMUOGELE MBANO AUTONOMOUS
   COMMUNITY, ABA
ROAD CONSTRUCTION AND REHABILITATION
1. RECONSTRUCTION OF EAST ROAD FROM SCHOOL ROAD 
    JUNCTION TO NGWA ROAD – 80% COMPLETED.
2. REHABILITATION OF OLD COURT BY DANFODIO ROAD – ACTION 
    ON HOLD.
3. REHABILITATION OF KENT ROAD/ CAMEROON ROAD – ACTION ON 
    HOLD.
4. REHABILITATION OF OLD COURT/  EHI ROAD – ACTION ON HOLD.
5. REHABILITATION OF OHANKU BY NGWA ROAD – ACTION ON HOLD.
6. REHABILITATION OF UMUOJIMA ROAD BY WORLD BANK – 
    COMPLETED.
7. FLOOD CONTROL AT UKWU MANGO AREA, FAULKS ROAD, ABA – 
   WORK-PROGRESS.

HEALTH CENTRE PROJECTS

SNO    LOCATION                            STATUS        
1.        ETITI OHUZU                        ONGOING
2.        ASAEME (ELU OHAZU)        COMPLETED AND PAINTED



17) ABA NORTH AND SOUTH LOCAL GOVERNMENT 
      AREAS

WATER PROJECTS
1. CONSTRUCTION OF EBEM OHAFIA WATER SCHEME, OHAFIA – 
    ONGOING.

HEALTH CENTRE PROJECTS

SNO    LOCATION                              STATUS
1.        EKELOGO EBEM                    FINISHING        - 90%
2.        OWUWANAYANWU               LINTEL LEVEL  - 60%
3.        AGBORJI ABIRIBA                 FINISHING       - 90%
4.        AMUMA OHAFIA                   COMPLETED    -100%
5.        UFIELE AKU                          COMPLETED    -100%
6.        NDI-IBE                                  COMPLETED    -100%
7.        ELUGHU NKPORO                COMPLETED    -100%

TRANSFORMERS DISTRIBUTION
1.        300KVA.11/0.415KV        AMANGWU OHAFIA
2.        300KVA.11/0.415KV        AMAEKPU OHAFIA
3.        300KVA.11/0.415KV        AMUKE OHAFIA COMMUNITY
4.        300KVA.11/0.415KV        AMAPU/ DIOHA AKANU AUTONOMOUS
   COMMUNITY